Gasboy Q Series Manual de usuario Pagina 2

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 3
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 1
020897 Rev. 06/12/03 Page 2
4. Behind the junction box, disconnect the existing vent tube and
remove the existing compression elbow in the pumping unit.
Install a 3/8” inverted flared fitting (item 9) into the pumping unit
where the compression elbow just been removed. Rotate the
new fitting at about 35° as shown in Figure 3.
Figure 3
5. Install the pre-assembled unit from Step 3 onto the underside of
the motor/pump platform. Using a ¼-20 x ½ Taptite screw
(item 8, feed through an existing hole in the platform that is
close to the flange and the left side column. Secure the unit
loosely. (Figure 4)
Figure 4
6. Connect the vent tube assembly with flared nuts (item 3)
between the pumping unit’s elbow and the bottom elbow of the
sump overflow assembly (item 1). (Figure 5: NOTE: Junction
box removed for visibility.)
Figure 5
Vista de pagina 1
1 2 3

Comentarios a estos manuales

Sin comentarios