Starting a Site Controller III System Start-up Overview
Page 4 MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008
Start-up Overview
Start-up for the CFN SC III system consists of the following:
Gathering site information from the customer for loading into the system
Verifying the physical system layout
Ensuring that the system complies with the guidelines and restrictions outlined in the
system Installation Manual and this manual
Testing the system
Helping the system user execute the commands needed to start the system
Helping the system user back up release disks and explaining backup procedures
Ensuring that the system user understands how to use the system
Filling out the GASBOY CFN System Start-up Form (55F-066)
Required Tools
To perform testing at start-up, the following tools are required:
Digital Voltmeter
1/4” Flat-blade Screwdriver
Phillips
®
Head #1 Screwdriver
Phillips Head #2 Screwdriver
Plastic Flat-blade Screwdriver (1/8” or smaller)
1/4” Drive Socket Handle
Note: A socket bit (C04479) #2, for the Island Card Reader (ICR) is shipped with every
CFN SC III system. This socket should be left with the end user.
Tape Measure
Diskettes (two to four blank double-sided, high-density diskettes for the SC III. Two blank
high density diskettes for Profit Point).
Note: Gasboy recommends that all tools and spare parts are with you when performing a
start-up procedure.