
CFN Series System
1-2 03/07/03
• Profit Point Reference Manual, C09203
Describes the operation of the Profit Point Console.
• Profit Point Clerk's Manual, C09201
Describes all point-of-sale operations for the Profit Point Console.
•
Point of Sale and Shift Change Manual, C09215
Describes POS and shift change operations.
• Star Receipt Printer Manual C08951
Describes the operation of the Star Receipt Printer.
• Series 9800 Installation/Operation Manual 035235
Describes installation/operation for Series 9800 pumps/dispensers.
• Fuel Point Reader Installation and Retrofit Instructions Manual, C35628
• Fuel Point Dispenser and Hose Retrofit Manual, C35593
• Fuel Point Vehicle Module Installation Manual, C35699
•
Fuel Point Vehicle Module Programming Manual, C35629
•
Fuel Point Parts Manual, C35709
START-UP OVERVIEW
Start-up for the CFN Site Controller II or Islander II system consists of:
• gathering site information from customer for loading into system
• verifying the physical system layout
• making sure the system complies with the guidelines and restrictions outlined in the system
Installation Manual
and this manual.
• testing the system
• helping the system user execute the commands needed to start the system
• helping the system user back up release disks and explaining backup procedures
• making sure the system user understands how to use the system
• filling out the GASBOY CFN System Start-up Form (CFN1-SUF)
Comentarios a estos manuales